What Contributes To A Mega Projects Success Within An Asset Management Framework?


Andrew Wheatley (FIEAUST, CPEng, NER, CFAM, GACID) is employed by Service Stream as a director of operations and maintenance. He is an electrical engineer with postgraduate qualifications and experience in systems engineering, operations and asset management within the transport infrastructure & defense sectors. Andrew also has extensive experience in maintenance engineering within the Australian Defence Force. Andrew is a part-time PhD student in the School of Mechanical and Mining Engineering at the University of Queensland in Australia, studying the transition and commissioning of a mega project from Design and construction to Operations throughout the asset management lifecycle.
With decades of experience in different technical and engineering industry sectors, Andrew Wheatley is currently bringing all these experiences together by researching an area as mega (major) projects transition from the procurement phase to the operational phase and the impact of success or failure of projects throughout its asset management (AM) lifecycle. The challenges of managing an asset over its lifecycle become more critical in a multi-asset system (systems of systems) with multi-interests, multi-stakeholders and investors. The modern technical interface and issues of complex software, physical assets and stakeholders can add considerable cost due to the requirements of modern infrastructure and major projects.
Different stakeholders will have different views with regard to project success. Much of the success of AM principles, especially in the private sector, can be attributed to the learnings of significant disasters or events of asset failure in terms of loss of life, lost revenues and/or organizational profits. In the public sector, a ‘perfect storm’ is taking place as the combination of aging large-scale infrastructure, reduced budgets, declining population, low affordability, and the accelerating transition to renewable energy create significant issues for infrastructure owners and managers.
Asset management has emerged as a recent engineering approach in the public infrastructure sector, which promises to achieve more value with effective and efficient management of resources. AM is founded on a set of fundamentals of value, alignment, leadership and assurance, which are detailed in the series of International Asset Management Standards ISO5500x. The goals of AM suggest that appropriate asset considerations, justifications and risk management assumptions in the procurement phase of an asset should be managed over the asset’s complete lifecycle, thus ensuring the best cost-benefit solution for the owner who financiers, builds and operates the asset. So why aren’t these fundamental concepts supporting the success of the delivery of a project? Where are the linkages to the operational outcomes of a mega-project? Project risks are often transferred during the commissioning and handover from design and construction (D&C) to the operations and maintenance (O&M) phase without the owners (or operators) of the asset being fully aware of the risk transfer or the associated cost implications. Commissioning schedules are being compressed or reduced due to project schedule pressures. These often unknown risks will increase the cost of managing and operating the asset due to what appeared to be (at the time) cost benefits and savings in the D&C phase of the asset procurement.